Skip to content
How it works

Setting up a field and driving it, screen by screen

One field, one block and one drilling pass. These are the screens you work through between opening a project and handing over the results.

01 · Draw

The field

Draw the boundary on satellite imagery with the area shown as you go, or import one you already hold. Fences, tramlines and headlands are imported as reference lines that you can measure against.

A 6.39 hectare field boundary drawn corner by corner around real ground, every vertex draggable, with the boundary panel open beside the map
02 · Lay out

Grid and placement

Enter the ranges, rows and plot size, take the spacing from your machine's working width, and set the numbering to match your fieldbook. As you move the block, eight clearance lines report the distance to the boundary, and you can type a distance to set it.

Fieldbase planning a multi-block trial: four plot grids in one layout, the selected block highlighted with its geometry panel open, 100 plots at 12 by 2 metres
03 · Drive

Run mode

Name the job, complete the preflight check, then arm the system. Fieldbase fires your outputs at each plot edge, and disarms them if the GPS fix is no longer good enough to rely on.

Run mode moments before arming: an RTK fix with 12 satellites, the machine inside plot 103 with the next trigger 3.7 metres out, and every preflight check green
04 · Record

Plot register and export

Each plot holds a record of what was done to it, by whom, and where each reading came from. Export the agronomy for your analysis, or the trigger points and driven route for your terminal.

The export dialog for the field: shapefile for Ag Leader, Trimble and Case IH, boundary and plots layers, WGS84 projection
The map underneath

Discards and plots cut off by the boundary

Discards are driven but not measured. Plots cut off by the boundary remain in the model and are marked as excluded, so your plot numbering does not change part-way through a season. Both are carried through to the export exactly as they appear here.

Eight plots swept and marked discard, with a guard range at each end of the block highlighted on the map, with the plot-type panel explaining that discards are driven but not measured and numbering re-flows around them

Set up your next trial in Fieldbase

Free to try, with no card required. The drive simulator lets you test a complete field before you connect a GPS receiver.